Ivy Street, Warminster

img_3004 img_3001 img_2998 20210719_164320 20210719_164215
img_3004
img_3001
img_2998
20210719_164320
20210719_164215

First, we removed all of the wood framing. Then, we removed the existing metal Bilco door and two courses of loose cinder block. Then, we installed two courses of cinder block and formed and poured a 4″ concrete cap. Then, we parged and finished all of the masonry with Dryvit. We installed the new custom fabricated, metal basement door.