Ferndale Road, Linfield

img_1890 img_1894 img_20210804_0802520_Sm4VM img_20210804_1335557_V5shm
img_1890
img_1894
img_20210804_0802520_Sm4VM
img_20210804_1335557_V5shm

For this project, we performed a little excavating for a concrete landing, then we cut the foundation wall and installed a 9 lite, insulated exterior door.