8th Avenue, Collegeville

img_1506 img_1510 img_1520 img_1521 img_1524
img_1506
img_1510
img_1520
img_1521
img_1524

We had to remove the existing metal egress system and egress window. Then we cut the opening for the new door and reduced the old opening with cinder block. The next day, we installed the Permentry stair, the Cleargress door and the 15 lite door at the base of the stairs. We back filled and cleaned up.